References: planning of electrical engineering for locks

Replacement construction of the Steinhavel weir

  • Planning the low-voltage supply, emergency power concept and UPS system

  • Lighting calculation for lock system incl. outer harbors and access route 

  • Planning of the complete building installation of the operating building

  • Development of a concept for lightning and surge protection and planning of the earthing system

more informations

Replacement construction of the small Kiel-Holtenau lock

  • Planning for renewal of electrical engineering so that continued operation is possible
  • Determination of energy requirements for several scenarios
  • Planning energy supply, traffic lights, lightning protection, grounding
  • Risk assessment according to the Machinery Directive

more informations

Overhaul of the Kachlet double-chamber lock

  • Planning the power supply and distribution
  • Preparing the airlock for remote control
  • Planning the control technology
  • Earthing, lightning protection and equipotential bonding

more informations

Basic repair of the Aldingen lock

  • Planning of electrical, control, communications and video technology
  • Planning the power supply, lightning protection, earthing, equipotential bonding
  • Construction supervision of electrical engineering left lock chamber
  • Risk assessment in accordance with the Machinery Directive

more informations

Overhaul and extension of the left chamber of the double chamber lock at Pleidelsheim

  • Renewal of all electrical engineering
  • New planning of energy supply, distribution as well as control and automation system
  • Planning using the BIM method
  • Grounding and lightning protection concept as well as construction monitoring

more informations

New construction to replace the Obernau barrier

  • Planning of electrical engineering for inflatable rubber dam, lock and boat lock
  • Filling and emptying system of the weir hoses
  • Power supply and distribution as well as control technology
  • Earthing, lightning protection, equipotential bonding and surge protection

more informations

DEK northern route: new construction of 5 locks, electrical engineering

  • Energy optimisation study
  • Technical equipment for the operational buildings, earthing and lightning protection concept
  • Planning of the control and instrumentation technology
  • Creation of a 3D simulation model for preliminary tests

more informations

New construction of the 5th lock basin in Brunsbüttel, technical equipment

  • System study on various conversion or replacement construction measures
  • Energy supply and control technology
  • Planning of earthing and lightning protection systems
  • Risk assessment according to the Machinery Directive

more informations