References: planning of electrical engineering for locks
New construction to replace the Obernau barrier
- Planning of electrical engineering for inflatable rubber dam, lock and boat lock
- Filling and emptying system of the weir hoses
- Power supply and distribution as well as control technology
- Earthing, lightning protection, equipotential bonding and surge protection
New construction of the 5th lock basin in Brunsbüttel, technical equipment
- System study on various conversion or replacement construction measures
- Energy supply and control technology
- Planning of earthing and lightning protection systems
- Risk assessment according to the Machinery Directive